He added that Phase 2 would deal with the extend through the Lekki 2nd toll gate on the Ajah underneath-bridge and would be divided into four sections. “Motorists from Ajah inward Lekki is going to be diverted to 1 lane even though repairs are ongoing on the opposite lane,” Osiyemi https://silasg419xae0.bmswiki.com/user