Penmann recently finalised a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet stringent hygiene and production requirements. The project encompassed the end-to-end implementation of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmarkspring.com/story15766395/penmann-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2