Consequently, the metro authority had to evacuate the persons, leading to large delays and gradual advancement in the development of the metro railway in that space.[167] The least qualification expected may differ based on the submit. Confer with Annexure A from the in depth notification for unique needs. Range System: https://railway-kolkata57801.bluxeblog.com/65277327/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf